Skip to content

Posts from the ‘Preparation’ Category

Interview with Adam Lisberg, MTA

"And then you take a look at something like the South Ferry Subway Station, which was built for $540 million and opened in 2009 or 2010 and it flooded floor to ceiling like a fish tank. So, how do we prevent against that in the future and how do we make it more resilient?"

Read more